Crane for condo rooftop AC in Sarasota

On low-rise condos a boom truck sets most rooftop AC units in a morning. Mid-rise buildings on the keys and downtown usually need a large hydraulic crane and a weekday slot booked well ahead.

Condo and coastal building lifts Published Updated

Shallow, clear water of Sarasota Bay off Longboat Key, with mangroves on the shore and towers on the far side

How much does a crane cost to lift AC units onto a Sarasota condo roof?

On a two to four story condo, a boom truck at $150 to $225 an hour usually does the job inside a 4-hour minimum, so $600 to $900. On a six story or taller building with units set back from the edge, a 100 to 165 ton crane at $330 to $570 an hour is common, which puts a half-day at about $1,420 to $2,380 with the permit fee.

  • Building height and how far the units sit from the street matter more than unit weight.
  • Swap every unit on the roof in one visit so the minimum covers them all.
  • Most associations want a certificate of insurance and a weekday work window before the crane is booked.
  • A crane on a City of Sarasota street needs a right of way use permit with a staging plan.

Get a crane estimate

Boom truck or crane for your building?

Two questions settle it: how many stories, and how far the units sit from where a truck can park. Capacity on a load chart drops quickly as the boom reaches out, so a 1,200 pound condenser at the roof edge is a small job, while the same unit 80 feet in from the street is a big one.

  • Two to four stories, units near the edge: a boom truck. Typical on Siesta Key and Venice low-rises and on villa-style buildings in Lakewood Ranch.
  • Five to eight stories, or units in the middle of the roof: a 100 ton class crane, sometimes parked on the street.
  • Tall towers downtown and on Longboat Key: a large crane or a helicopter, planned weeks out.

Since 2022, Sarasota condos have been through Ian, Idalia, Debby, Helene and Milton. A lot of rooftop equipment has been patched more than once, and associations are replacing whole roofs of units at a time. That is good news for the bill: four or eight units in one visit cost little more than one.

What a condo swap costs

On published rate cards, boom trucks run $150 to $225 an hour on a 4-hour minimum that includes two hours of travel. One or two units on a low-rise building usually land at $600 to $900.

A 100-ton crane ran $330 an hour and a 165-ton $570, each with a 4-hour minimum and a $100 permit fee above 50 tons. Half a day on a mid-rise: about $1,420 to $2,380. Street closures, police detail and overtime for an early start add to that.

Paperwork the association will ask for

  • A certificate of insurance from the crane company naming the association.
  • The date, the hours and where the crane will sit, so residents can move cars.
  • A right of way use permit if the crane uses a City of Sarasota street. The city wants a staging plan with the crane location and swing radius.
  • Roof access for the crew and a plan for the old units, which usually come down on the same lift.
All-terrain crane with a luffing jib reaching over a mid-rise building, the reach a Gulf-front condo roof needs
Large all-terrain cranes handle the long reaches on mid-rise condo roofs.

On the keys

Siesta, Lido and Longboat are barrier islands. If the project adds or changes a structure seaward of the coastal construction control line, the state’s CCCL program may need a permit. Lots are tight and many buildings sit behind pools and pavers, so tell the operator what the truck will park on.

Frequently asked

Who arranges the crane for a condo AC replacement?

Usually the AC contractor, but many property managers book it themselves to control the date. Either way, the association will want the crane company's insurance certificate on file before lift day.

Can the crane set up on the street in front of a downtown Sarasota condo?

With a permit. Inside city limits, a right of way use permit from City Engineering is required, and the staging plan has to show where the crane sits and the area its load swings through.

Do barrier island condos need a state permit for a new AC unit?

A like-for-like swap usually goes through the local building department only. Work that adds or changes a structure seaward of the coastal construction control line, like a new equipment platform, can need a state CCCL permit. Your contractor will know which applies.

References

  1. City of Sarasota Engineering, right of way use permits
  2. City of Sarasota Code, Chapter 30, streets and sidewalks (right of way use)
  3. Florida DEP, Coastal Construction Control Line program
  4. OSHA 29 CFR 1926.1417, operation and load charts
  5. AP Crane Solutions, boom truck rates (California)
  6. Hurd Oilfield Service, crane rates (Jack County, Texas)

Get this lift estimated by a local operator

Ballpark numbers work. Photos help, and the operator follows up.

Get a condo AC lift estimated

Your contact details
The lift

(from the spec sheet, if you have it)

If you can pace off the truck to the spot, you can fill this in.

The day you need the lift done, if you know it.
Last details
Which are you? (optional)

Free estimate request, about a minute.

Get a crane estimate